Inside the engineering megaproject that went horribly wrong | Four Corners
Australia’s Snowy 2.0 was sold as a nation-building megaproject for a low-carbon future – and was meant to be feeding power into the grid by the end of 2024. Instead, the pumped hydro project, which was once estimated to cost $2 billion, is four years behind schedule and now forecast to hit $12 billion. In this documentary, Four Corners reveals the inside story of Snowy 2.0 and how it all went so horribly wrong.
Courtesy of ABC News In-depth on YouTube. Watch on YouTube ↗
Sponsored
More Technology Documentaries
Cicada 3301: An Internet Mystery2018•18m•HD•★8.9
The Internet's Own Boy: The Story of Aaron Swartz2014•1h 45m•HD•★8.7
How Big Oil Conquered the World2017•1h 11m•HD•★8.6
Tesla: Master of Lightning2016•1h 26m•HD•★8.6
The AI Doc2025•12m•HD•★7.6
Social Media Dangers: Childhood 2.02020•1h 28m•HD•★8.0
The Story of Microsoft: How a Computer Club Took Over the World2022•18m•HD•★8
Trans-Siberian by Private Train2013•35m•HD•★7.9
We Choose to Go to the Moon: NASA’s First Great Challenge | Free Documentary Space2026•52m•HD•★7.8
How 70s Hippies Shaped the Tech Giants of the Silicon Valley | Extra Long Documentary2024•1h 43m•HD•★7.7
From bees to robots: The new power of swarm intelligence | DW Documentary2026•51m•HD•★7.7
How Trains Climb Heights That Would Derail Cars2026•2h 16m•HD•★7.7